- Architecture ServedProject Featured On:Architecture Served — 7/11/12
Bridge Project
- Bridge ProjectGoal: create a 4 oz. bridge that spans 2 ft. and holds as much weight as possible
Result: our bridge held 292.8 lbs, beat the school record, and held the most weight in the class 


Team: Sara Barrett, Justin Mast, Neal Dixon, Karen Henderson



Discuss This Project: ( Comments)